All loose and flaking paint
is thoroughly scraped, sanded, and removed.
STEP 4: RESET LOOSE NAILS
All loose nails on siding,
trim, and eaves are reset.
STEP 5: PRIME BARE AREAS
All bare areas are properly
primed; for example, metal gutters and downspouts receive galvanized
and rust inhibitive primers; stucco and wood surfaces receive proper
primers.
STEP 6: CAULK WINDOWS AND
DOOR FRAMES
All windows and door frames
are thoroughly caulked to enhance the appearance of the paint job
and help insulate the windows on your home.
STEP 7: PATCH CRACKS IN STUCCO
Any and all cracks in
stucco and cement foundation are properly repaired.
STEP 8: REMOVE AND
REPLACE FIXTURES
All light fixtures (when
possible), address numbers, hose racks, etc. are removed prior to
painting and replaced upon completion of painting.
STEP 9: PATCHING OF CRACKED BOARDS
All minor cracks in
fascias, siding, trim boards, etc. are properly patched.
STEP 10: REPAIR LEAKY GUTTERS AND DOWN SPOUTS
Seal and patch all leaky
gutters and downspouts when possible.
STEP 11: PROTECT WINDOWS AND GARDENS
All windows and gardens are properly
covered prior to painting.
STEP 12: PROPER WASTE DISPOSAL
All garbage, empty buckets and clean-up water is brought
to our warehouse and disposed of properly.
STEP 13: NO DRIPS, SAGS, OR RUNS
All paints are professionally applied at the proper
thickness to insure there will be no drips, sags, or runs.
STEP 14: MAJOR BRAND PREMIUM PAINTS
We use Sherwin Williams, Frazee, Vista Paint &
Kelly Moore premium paints.
STEP 15: SPOTLESS CLEAN-UP
All walkways, sidewalks, and all unpainted areas
are cleaned of any paint debris.